Results of our surveys in Marburg (MoVe 35): Final presentation

As part of a joint digital exchange with the city administration of the city of Marburg (including citizen participation and transport planning) on September 25, 2024, the research group presented the results of the surveys in connection with the participation process for the MoVe 35 mobility and transport concept. The MoVe 35 project was one of a total of five planning projects that were intensively investigated by the CIMT research group over several years in order to examine the effects of consultative citizen participation on political attitudes, among other things.

Various participation formats were carried out as part of the planning process, e.g. an online survey, workshops, a project advisory board and an online dialog on public transport. A (council) referendum was also held in connection with the mobility concept. Further information on the MoVe 35 project and the participation formats used can be found on the city of Marburg’s website.

This planning and participation process was examined by the CIMT research group at Heinrich Heine University Düsseldorf independently (i.e. without being commissioned or influenced by the city of Marburg), primarily with the help of surveys of Marburg residents. For this purpose, a randomly selected part of the population in Marburg was surveyed in 2021 and 2024. Further information on the research group’s surveys can be found here.

Selected results

  • As in all of our project areas, transport policy and the transport transition are conflicting issues. In Marburg, however, there is a particularly clear contrast between the educational groups. For example, the majority of people without a high school diploma reject the idea of reducing space for car traffic in the future, while almost half of those with a high school diploma can imagine doing so.
  • Supporters and opponents of the mobility transition were similarly represented in the participation process. It was noticeable that an above-average number of car drivers took part in Marburg.
  • The measures envisaged as part of Move 35 are viewed positively by the majority of people with high education in order to achieve the goals of sustainable mobility – in contrast to people without high education.
  • The very different assessments of the two educational groups are also evident in the (planned) voting behavior for the referendum on halving car traffic: the majority of people with high education are in favor, the majority of people with low education are against, and participants in the consultation process are divided.
  • Although satisfaction with the local institutions (mayor, city administration, council) was slightly better overall than in other project areas, it deteriorated significantly between 2021 and 2024 among people with low education.
  • The information on the participation process reached a large part of the population. Nevertheless, it was mainly highly educated middle-aged men who took part – typical of consultative participation. It had a relatively large impact on citizens’ satisfaction with the mayor, administration and council. As expected, people who welcome the measures of MoVe 35 tend to be more satisfied, while those who reject the measures express greater dissatisfaction.

Download presentation

A prepared form of the results presentation can be downloaded here:

Results of our surveys in Offenburg (OG 2035): Final presentation

In a joint meeting with representatives from the city of Offenburg’s urban development and transport planning departments on October 11, 2024, the research group presented the results of the surveys conducted in connection with the participation process for the OG 2035 Transport Master Plan. The Transport Master Plan OG 20235 was one of a total of five planning projects that the CIMT research group studied intensively over several years in order to investigate the effects of consultative citizen participation on political attitudes, among other things.

Various formats were carried out as part of the planning process, e.g. online dialogs, workshops, local forums, youth participation and the establishment of pop-up measures. Further information on the OG 2035 project and the participation formats carried out can be found on the City of Offenburg website.

This planning and participation process was examined by the CIMT research group at Heinrich Heine University Düsseldorf independently (i.e. without being commissioned or influenced by the city of Offenburg), primarily with the help of surveys of Offenburg residents. For this purpose, a randomly selected part of the population in Offenburg was surveyed in 2021 and 2023. Further information on the research group’s surveys can be found here.

Selected results

  • Transport policy and the transport transition are conflicting issues in Offenburg – just like in all other project areas examined. All opinions were represented in the participation process, although those in favor of the mobility transition were somewhat stronger and car users were also less common.
  • Satisfaction with the local institutions (mayor, city administration, council) is rather average overall (and slightly worse than in other project areas) and deteriorated significantly from 2021 to 2023 in particular.
  • The transport measures adopted as part of the OG 2035 master plan do not satisfy all interests, but overall only a minority (20-25%) are really against them. People who took part in the participation process rate the results more positively overall.
  • As with most open participation formats, the participants are not representative of the population. They are mainly people with a high school diploma, middle-aged people and men.
  • The participation process had a (comparatively low) and overall negative influence on satisfaction with local politics and administration, whereby the city administration was rated more positively than the mayor and council, especially by the consultation participants. As expected, people who welcome the measures of OG 2035 tend to be more satisfied, while those who reject the measures express greater dissatisfaction.

Download presentation

Results of our surveys in Marburg (MoVe 35): Final presentation

As part of a joint digital exchange with the city administration of the city of Marburg (including citizen participation and transport planning) on September 25, 2024, the research group presented the results of the surveys in connection with the participation process for the MoVe 35 mobility and transport concept. The MoVe 35 project was one of a total of five planning projects that were intensively investigated by the CIMT research group over several years in order to examine the effects of consultative citizen participation on political attitudes, among other things.

Various participation formats were carried out as part of the planning process, e.g. an online survey, workshops, a project advisory board and an online dialog on public transport. A (council) referendum was also held in connection with the mobility concept. Further information on the MoVe 35 project and the participation formats used can be found on the city of Marburg’s website.

This planning and participation process was examined by the CIMT research group at Heinrich Heine University Düsseldorf independently (i.e. without being commissioned or influenced by the city of Marburg), primarily with the help of surveys of Marburg residents. For this purpose, a randomly selected part of the population in Marburg was surveyed in 2021 and 2024. Further information on the research group’s surveys can be found here.

Selected results

  • As in all of our project areas, transport policy and the transport transition are conflicting issues. In Marburg, however, there is a particularly clear contrast between the educational groups. For example, the majority of people without a high school diploma reject the idea of reducing space for car traffic in the future, while almost half of those with a high school diploma can imagine doing so.
  • Supporters and opponents of the mobility transition were similarly represented in the participation process. It was noticeable that an above-average number of car drivers took part in Marburg.
  • The measures envisaged as part of Move 35 are viewed positively by the majority of people with high education in order to achieve the goals of sustainable mobility – in contrast to people without high education.
  • The very different assessments of the two educational groups are also evident in the (planned) voting behavior for the referendum on halving car traffic: the majority of people with high education are in favor, the majority of people with low education are against, and participants in the consultation process are divided.
  • Although satisfaction with the local institutions (mayor, city administration, council) was slightly better overall than in other project areas, it deteriorated significantly between 2021 and 2024 among people with low education.
  • The information on the participation process reached a large part of the population. Nevertheless, it was mainly highly educated middle-aged men who took part – typical of consultative participation. It had a relatively large impact on citizens’ satisfaction with the mayor, administration and council. As expected, people who welcome the measures of MoVe 35 tend to be more satisfied, while those who reject the measures express greater dissatisfaction.

Download presentation

A prepared form of the results presentation can be downloaded here:

Addressing Mobilities Controversies through Public Participation?

In a presentation at the C-MUS Congress 2024 in Aalborg (Denmark), Katharina Holec, Laura Mark and Tobias Escher presented selected recommendations for managing planning conflicts in the context of the transport transition.

These recommendations are derived from various research findings from the CIMT project. They are based on quantitative data from surveys of more than 2,000 people and qualitative data from more than 20 interviews on various mobility planning processes in three German cities, as well as a quantitative analysis of the participation landscape in Germany based on an extensive database of over 350 transport-related participation processes that we have compiled.

Recommendations

For the presentation, the following two recommendations were selected from those developed to date and presented for discussion:

It is not the role of a consultation to reach a consensus!

This is derived from the fundamentally conflictual nature of transport planning, which is also reflected in our data and could not be satisfactorily resolved by the participation formats analysed. For example, in the freiRaum Ottensen project, despite extensive participation, 21% of participants were still dissatisfied with the decision made, and 74% of the population were not even aware of the opportunity to participate. This means that the aim should not be to resolve conflicts, but to create a forum for dialogue and the generation of ideas, and that participation should not be judged by the degree of conflict resolution.

Consultation results must be complemented with other perspectives in order to come to a balanced decision!

Participation results can provide a picture of existing concerns and should be taken seriously, but firstly they do not reflect the general mood of the population due to their lack of representativeness, and secondly it cannot be assumed that all important aspects for the mobility transition are included or that mainly supportive contributions are made. This means that consultations should be supplemented by other forms of participation. Participation results should be supplemented and weighed up with other perspectives from different stakeholder spheres and cannot replace a bold political decision.

Presentation and publication

We are currently working on a compilation of these and other empirically based recommendations for the use of participation in the transport transition. This publication will be linked here once it has been finalised. The presentation can be downloaded here:

Sustainable mobility and housing for families (in Düsseldorf)

In this presentation for the Düsseldorfer Familientisch, a network of various stakeholders in Düsseldorf, Tobias Escher explained why mobility and housing are closely linked. A transformation of the current car-centred mobility system is doomed to fail without a simultaneous change in housing policy – and not just in cities. He began by explaining that sustainable mobility is more than just making transport more environmentally friendly, but also targets traffic noise and road safety. Using the example of housing for families, he showed how their concerns and needs differ greatly between those who live in urban centres and families who settle in the proverbial ‘little house in the country’. For both groups, he presented a range of measures that can be used to promote more sustainable mobility options. These range from promoting opportunities for working and shopping nearby to more appropriate pricing of public space.

The event took place on 12 June 2024. There is more information available from the official record of the event.

Acceptance for transformation projects through public participation? A plea for more realism

In this article in the eNewsletter Netzwerk Bürgerbeteiligung, Tobias Escher, Katharina Holec and Laura Mark make the argument for a more realistic view of the role of citizen participation in the sustainability transformation. Based on four theses, they explain that conflict resolution – even though this is often associated with participation – does not do justice to the role of public consultations, but that consultations are nevertheless indispensable in the political shaping of transformation.

Summary

The article puts forward a total of four theses, each of which is supported by findings from the research of the CIMT project. These are as follows:

  • Thesis 1: Citizen participation can lead to mutual understanding, but generally not to a consensus on fundamental conflicts of interest.
  • Thesis 2: Citizen participation provides an insight into existing interests and concerns, but not a representative impression of public opinion
  • Thesis 3: The results of participation do not guarantee support for sustainable transformation measures.
  • Thesis 4: Citizen participation is a support, but not a substitute for political decisions.

However, this does not imply that citizen participation can be dispensed with! Instead, good participation can provide support by giving information and thus, for example, overcome resistance that is primarily based on a lack of knowledge. It also uses local knowledge to recognise problems and develop new ideas where necessary. Finally, it provides a forum in which wishes and concerns can be expressed and arguments exchanged. This can lead to less protest. It can help to identify lines of conflict more clearly and to better understand the causes of conflicts. Citizen participation can thus contribute to dealing with the conflicts inherent in the transformation, but it will not usually resolve them. Last but not least, citizen participation remains a democratic imperative, as citizens should be able to shape far-reaching decisions.

Publication

Escher, Tobias; Holec, Katharina; Mark, Laura (2024): Akzeptanz für Transformationsprojekte durch Bürgerbeteiligung? Ein Plädoyer für mehr Realismus. Hg. v. Stiftung Mitarbeit. Bonn (eNewsletter Netzwerk Bürgerbeteiligung, 02/2024). Online verfügbar hier.

Results of our research in Hamburg-Ottensen (freiRaum Ottensen): Final presentation

In a joint meeting with representatives of the district office Altona in Hamburg on 7 December 2023, the research group presented the results of the data collection in connection with the freiRaum Ottensen project. FreiRaum Ottensen was one of the five projects in which surveys and interviews were conducted. The focus was on the public consultations in which the general public was able to participate. More information on the project freiRaum Ottensen and the participation formats carried out can be found here.

Selected results

  • The population in Ottensen largely perceives a need for improvement in transport and is relatively positive about the transport transition overall.
  • Around 50% of the population have heard about the participation process for freiRaum Ottensen, and around 16% have taken part. In comparison with other processes, these are relatively high figures, although the usual over-representation of people with high school diploma, men and older people can be seen despite a wide varieties of participation formats offered to different target groups.
  • The discussion during the different participation formats was perceived as constructive and respectful, although conflicts and gaps in the representation of all interests were acknowledged.
  • In this project, the policy process was comparatively open to citizens and participants were able to shape the content of the planning outcome.
  • For around a third of the population and half of the participants, the participation process had an influence on their satisfaction with the district authority. However, this influence was not always positive: for example, one in four participants was more satisfied with the district authority at the end, but just as many reported less satisfaction.
  • Two thirds of the population rated the adopted measures as positive.
  • (Statements on the population generally refer to the subgroup of people with a high school diploma – see detailed information on the representativeness of the surveys)

Download

The detailed presentation is available in German.

AI for the evaluation of participation? The potential of language models to recognise modes of transport in participation contributions

In this article in the journal Internationales Verkehrswesen, Laura Mark, Julia Romberg and Tobias Escher present a language model that can be used to reliably recognise modes of transport in participation contributions. They show that supervised machine learning can usefully support the evaluation of participation contributions in mobility-related online participation processes.

Summary

Consultations are an important part of transport planning and can help to integrate knowledge from the public into the planning process. However, online formats in particular often result in large volumes of contributions, the thorough evaluation of which is resource-intensive. It is hoped that the use of AI will support this.

The language model presented in this article is based on the concept of supervised machine learning for text classification. Pre-trained models are re-fined using smaller data sets. In this way, a model can be adapted to a specific area of application, such as mobility-related consultation processes.

A pre-trained German-language version of the high-performance RoBERTa language model was used as a starting point. Using a categorisation scheme that mainly distinguishes between the modes of transport mentioned, 1,700 contributions from seven transport planning consultation processes were manually coded. The resulting data was used partly as training data for fine-tuning the language model and partly for evaluation.

Results

  • Overall, it was shown that language models already available today are suitable for supporting the evaluation of consultation processes in practice. The language model developed here for recognising the modes of transport can serve as the basis for a specific application in municipal planning practice.
  • The post-trained RoBERTa language model is very effective at assigning the appropriate modes of transport. The model presented by us can always reliably assign well over 90% of the entries correctly to the modes of transport they contain.
  • For the processes on whose contributions the model had been trained, an average of 97% of the categories could be correctly assigned (on a separate test set). For contributions from other transport-related participation procedures, the appropriate modes of transport could still be assigned very reliably with an accuracy of 91 to 94%.
  • The performance of the model therefore hardly deteriorates when it is applied to previously unknown data from mobility-related participation procedures. This means that manual coding in advance can be omitted, at least for similarly structured participation procedures, which significantly reduces the effort involved.

Publication

Mark, Laura; Romberg, Julia; Escher, Tobias (2024): KI zur Auswertung von Beteiligung. In: Internationales Verkehrswesen 76 (1), S. 12–16. DOI: 10.24053/iv-2024-0003

Pushback for the municipal mobility transition? Joint closing event of SÖF Junior Research Groups CIMT and MoveMe on 26th April 2024

The two junior research groups in Social-Ecological Research CIMT and MoveMe held a joint final event showcasing some results of their research into the transition to sustainable mobility. The event took place online on 26. April 2024. More information is available in German.

Is that fair? An evaluation tool for local mobility measures

In this article in the journal Internationales Verkehrswesen, Laura Mark, Annika Busch-Geertsema, Jessica LeBris, Gesa Matthes and Kerstin Stark present a practical approach to assess the justice of transport measures in various dimensions. The approach and the article were developed in the context of the working group “Mobilität, Erreichbarkeit und soziale Teilhabe” of the Academy for Spatial Development in the Leibniz Association (ARL).

Summary

This paper presents a practical tool for taking a systematic “second look” at mobility transition measures through the lens of justice. It can be used for conceptual support during planning and implementation, for reflection during or after the process as well as ongoing monitoring. Three dimensions of justice can be used to analyse which population-groups benefit from these measures. The dimensions used are distributive justice, recognition of different realities of life and procedural justice, which have been further differentiated and combined in an easy-to-use matrix.

To differentiate the recognition of different realities of life, the Persona approach is employed. In a Persona, specific characteristics are combined that can influence and restrict mobility options, decisions, and activity chains. The article proposes a system for developing custom Personas, but the Personas already developed by the authors can also be used for the application.

The article provides a detailed presentation of the dimensions of justice and the Persona approach. It can be downloaded here:

Furthermore, the evaluation tool, including a user manual and suggestions for Personas, can also be downloaded in Excel format from the ARL Mobility Working Group website (scroll down). The authors welcome feedback and encourage free use and further development.